QUALITY PLAN

( Final Inspection )

QFM / QC /  11

REV. STATUS : 01

Dated : 03/12/2003

S. NoProductTest PerformedChecking  Parameter

Method of Checking

Sample  SizeFrequencyIMTE UsedAcceptance  Criteria
1.Pipe FittingsPhysical VerificationDimensionsManual8 pcs / itemEach LotVernier CalliperAs per  SS . QFM
/ QC /  01
Wall  thicknessManual8 pcs / item-do-P– type CaliperAs per  SS . QFM
/ QC /  01
CracksVisual13 pcs / item-do-——–No  cracks as per IS : 1879 – 1987
UnfilledVisual-do--do-——–No  unfilled as per IS : 1879 – 1987
Deep  pitsVisual-do--do-——–No  deep  pits as per IS : 1879 – 1987
ShiftingVisual-do--do-——–No  shifting as per IS : 1879 – 1987
DepositsVisual-do--do-——–No  deposits as per IS : 1879 – 1987
Zinc  CoatingsSurface smoothnessVisual-do--do-———-Smooth  surfaceas as IS : 1879 – 1987
Flux  ashVisual-do--do-———-No flux ash as per IS : 1879 – 1987
Bare patchesVisual-do--do-———-No bare patches as per IS : 1879 -1987
PimplesVisual-do--do-———-No pimples as per IS : 1879 – 1987
LumpsVisual-do--do-———-No lumps as per IS : 1879 – 1987
Rust strainsVisual-do--do-———-No  rust  strains  as IS : 1879 – 1987
Excess  / less depositsVisual-do--do-———-No excess/less deposits IS : 1879 – 1987
Alignment TestStraightness / 90�Manual8 pcs / item-do-Jigs180�� ��,  90�� ��
IS : 1879 – 1987
ChamferingExternal / Internal threadsVisual-do--do-———-No item without  chamfer
ThreadingGauge -do--do-Thread Guage� 1�  thread as  per  IS: 8999 – 1979
Chemical TestCarbon contentManual2 pcs/item-do- No  shifting as per IS : 1879 – 1987
Silicon contentManual2 pcs/item-do- No  shifting as per IS : 1879 – 1987
Pneumatic TestAir–leakageManualWhole Lot-do- At 15 bar pressure no leakage of air bubbles when dipped inside water
Remarks :- 1. All  dimensions  are in  mm.  unless  otherwise  specified.
                 2. Calibrated  instruments  are used  for  inspection.
                 3. 100%  pneumatic  test is  performed  for  gas fittings only.