QUALITY PLAN
( Inspection of In-process Material )
QFM / QC / 08
REV. STATUS : 01
Dated : 03/12/2003
| S. No | Product | Operation/ Stage | Checking Parameter | Method of Checking | Sample Size | Frequency | IMTE Used | Acceptance Criteria |
| 1. | Pipe Fittings | Casting | Dimensions | Manual | 2 pcs / item | Daily | Vernier Calliper | As per SS . QFM / QC / 01 |
| Wall thickness | Manual | 2 pcs / item | Daily | P– type Caliper | As per SS . QFM / QC / 01 | |||
| Cracks | Visual | 100%/item | Daily | ——– | No cracks | |||
| Unfilled | Visual | 100%/item | Daily | ——– | No unfilled | |||
| Deep pits | Visual | 100%/item | Daily | ——– | No deep pits | |||
| Shifting | Visual | 100%/item | Daily | ——– | No shifting | |||
| Deposits | Visual | 100%/item | Daily | ——– | No deposits | |||
| Chemical Test | Carbon contents | Lab Test | 10 – 20 gms | Once in 4 months | Lab. test (outside) | 2.7 – 3.2 % | ||
| Silicon contents | Lab Test | 10 – 20 gms | 1st & 3rd Heat | Lab test | 0.8 – 1.2 % | |||
| Heat Treatment | Temperature | Manual | Each Furnace | Each C.U. No | Pyro – meter | Min.850�C ,Max 950�C for 24 hrs | ||
| Compression Test | Malleability | Bench vice | 9 pcs | Each C.U. No. | Vernier Calliper | 5 % upto 2″ � & 3 % above 2″ � | ||
| Mechanical Test | Elongation / UTS | Out side agency | 3 pcs test bar | Each C.U.No. | Tensile testing m/c | Min.6%@ 300 Mpa IS: 14329 – 1995 | ||
| Stone Grinding | Unwanted material | Visual | 100 % / item | Daily | ———- | Free from unwanted material | ||
| Shot Blasting | Surface cleaning | Visual | 100 % / item | Daily | ———- | Free from rust etc. | ||
| Galvanizing | Mass of Zinc Coating | Dip Test | 3 pcs / C.U No | Daily | Lab test | Min.610 gms / m� IS: 4759 – 1979 | ||
| Zinc Coatings | Surface smoothness | Visual | 100 % / item | Daily | ———- | Smooth surface | ||
| Flux ash | Visual | 100 % / item | Daily | ———- | No flux ash | |||
| Bare patches | Visual | 100 % / item | Daily | ———- | No bare patches | |||
| Pimples | Visual | 100 % / item | Daily | ———- | No pimples | |||
| Lumps | Visual | 100 % / item | Daily | ———- | No lumps | |||
| Rust strains | Visual | 100 % / item | Daily | ———- | No rust strains | |||
| Excess / less deposits | Visual | 100 % / item | Daily | ———- | No excess / less deposits | |||
| Chamfering | External / Internal threads | Visual | 5 pcs / item | Hourly | ———- | No item without chamfer | ||
| Machining | Threading | Manual | 5 pcs / item | Hourly | Thread Gauge | � 1� thread as per IS: 8999 – 1979 | ||
| Damaged threads | Visual | 5 pcs / item | Hourly | ———- | No damaged threads | |||
| Alignment Test | Straightness / 90� | Manual | 5 pcs / item | Hourly | Jigs | 180�� ��, 90�� �� IS : 1879 – 1987 | ||
| Pneumatic Test | Air–leakage | Compressed air | 13 pcs / item | Daily | Pressure dial gauge | No leakage @ 10 Kg/cm� IS : 1879 – 1987 | ||
| Hydrostatic Test | Water–Leakage | Hydraulic pump | 13 pcs / item | Daily | Pressure dial gauge | No leakage @ 21 Kg/cm� IS : 1879 – 1987 | ||
| Barrel | Oily-surface cleanliness | Visual | 100 % / item | Daily | ———- | Free from oil | ||
| Remarks :- 1. All dimensions are in mm. unless otherwise specified. 2. Calibrated instruments are used for inspection. 3. 100% pneumatic test is performed for gas fittings only. | ||||||||